- Size of Arena - 320,801 GSF Total Project Cost - $75 million
- Seating Capacity - 15,061 (60% lower bowl, 40% upper bowl)
- Student Seating - Dedicated student bleacher section behind the west basket of approximately 3,000
- Accessible Accommodations - Exceeds all ADA requirements for seating and access (subject to availability)
Facility Amenities
- Private Suites - 24 Club Seating - 1,000 (including a private club lounge area)
- Office Space - Men's and Women's Basketball, Athletic Administration and Building Operations
- Support Facilities for Men's and Women's Basketball - Locker, weight and equipment rooms, practice gym, video classrooms, academic study center
- Hall of Fame Lobby Area - Will showcase MU's Athletic Hall of Fame and other Tiger athletic traditions
- Spectator Amenities and Support Facilities - Hospitality room, concessions, novelty sales, tickets, etc.
Latest Trivia Information on Mizzou Arena
- At its peak, the roof is 11'6" taller than the Hearnes Center
- Height of arena from event level to peak of roof is 117'9" (Hearnes is 110')
- Last row of arena on sides is 133' horizontally to side of court (Hearnes is 134')
- Last row of arena on sides is about 64' vertically to side of court (Hearnes is 79')
- Last row of arena on ends is 96' horizontally to end of court (Hearnes is 123')
- Last row of arena on ends is 40' vertically from end of court (Hearnes is 79')
- The seating bowl of the arena fits cleanly inside seating bowl of Hearnes
Facts
- 21,600 cubic yards of concrete (2700-3000 truck loads)
- 2,006 tons of reinforcing steel 18 tons of post tension cable (over 60,000 feet or over 11 miles)
- 18 tons of post tension cable (over 60,000 feet or over 11 miles)
- 1,500 tons of structural steel
- Long span trusses 285' long, 12' high, 65,000 pounds each
- 566 pieces of structural precast
- 453 pieces of architectural precast
- 104,074 bricks
- 67,934 concrete blocks
- 684 anchor bolts
- 460 doors and frames
- 172 toilet compartments
- 237 lockers
- 743 toilet accessories
- 77,400 square feet of carpet
- 100,000 square feet of metal roof panels
- Communication cable - over 37 miles
- Excavation - 79,000 CY of non rock, 40,000CY of rock (would fill a football field over 67' deep)
- Cranes - 300 ton for trusses. Also 45 ton, 55 ton, 80 ton, 100 ton, 225 ton, and others as needed
|